folder Guyana MRVS Interim Measures Reports

This category contains documents associated with The Guyana MRVS Interim Measures Reports for the years 2010,2011, etc.

Documents

pdf Guyana Forestry Commission Guyana REDD+ Monitoring Reporting & Verification System (MRVS) Interim Measures Report 01 October 2010 – 31 December 2011 Version 3 26 July, 2012

By 96 downloads

Download (pdf, 12.54 MB)

Guyana's MRVS Interim Measures Report - Year 2.pdf

Guyana Forestry Commission Guyana REDD+ Monitoring Reporting & Verification System (MRVS) Interim Measures Report 01 October 2010 – 31 December 2011 Version 3 26 July, 2012

This third version of the Report has been produced taking into consideration stakeholder feedback received during a public release period executed over 15 June, 2012 to 6 July, 2012, as well as feedback and corrective actions resulting from the recently conducted (13-20 July),independent verification by Det Norkse Veritas.

pdf Guyana Forestry Commission Monitoring Reporting and Verification System Interim Measures Report, Version 1 1 October, 2010 – 31 December, 2011 Popular

By 102 downloads

Download (pdf, 431 KB)

Statement on IMR Year 2 - MRVS.pdf

Guyana Forestry Commission Monitoring Reporting and Verification System Interim Measures Report, Version 1 1 October, 2010 – 31 December, 2011

The Guyana Forestry Commission (GFC) is pleased to release, the second performance report on Interim Measures for Reducing Emissions for Deforestation and Forest Degradation Plus (REDD+), under Guyana’s Monitoring Reporting and Verification System (MRVS).

pdf Guyana MRVS Interim Measures Report 16 March 2011Guyana Forestry Commission Guyana REDD+ Monitoring Reporting and Verification System (MRVS) Interim Measures Report Popular

By 127 downloads

Download (pdf, 8.23 MB)

Guyana MRVS Interim Measures Report - 16 March 2011.pdf

Guyana MRVS Interim Measures Report   16 March 2011Guyana Forestry Commission Guyana REDD+ Monitoring Reporting and Verification System (MRVS) Interim Measures Report

The methods and results of the assessment for the period October 1, 2009 to September 30, 2010 will be subject to independent third party verification and is a requirement for the results-based financial support for 2011.